Check of the converted furnaceWhen all works on re-equipment are finished,
check tightness of the furnace and a chimney. For check of density of a laying
of the furnace in full tankе burn any resinous substance (building roofing felt),
giving considerable quantity of a smoke. After occurrence of a steady flame densely
close a latch furnaces. If the smoke passes through a laying, means, a laying
leaky. kiev flowers . online prednisone;flagyl no prescription שמלות כלה
For check of density of a chimney the resinous rags on a latch cloth is
burnt at opened дверке. After occurrence of a steady flame by a piece of roofing
iron close an aperture of the smoke channel on a chimney. If the smoke appears
in the next channels or premises adjoining the channel, means, the channel leaky.buy finasteride;Russian girls body After the termination of check of tightness of the furnace and a chimney
in full tankе the torch is established. The general теплоотдача it (at two
fire chambers a day) 1760 kcal/ch. At burning of gas fuel small-sized furnaces have steady operational to.
The item . Within 82-87 %.
Re-equipment
on gas of heating furnaces of average dimensions. After the termination of a spadework
from the furnace delete top internal and зольниковую дверки and a grid-iron lattice.
In the first row a bricklaying establish a regulator of secondary air with cross-section
section 70х100 mm. For pass of secondary air from зольника in full tank spread
the channel. On three numbers above a framework of a regulator of secondary air
establish a framework of a gas torch and fix to a laying. Simultaneously with
installation of a framework of a torch spread partitions in full tankе for a direction
of a stream of products of burning to the furnace basis, than intensive heating
of the bottom zone is reached. Walls full tankа футеруют a brick (a thickness
1/2 bricks). Then put an aperture of a forward wall of the furnace where has been
established top internal дверка. Establish tight дверку over a furnace latch.
Check tightness of "cleanings" of flues of the furnace. Repair a chimney
(if there are defects in its laying) and spread оголовок. Further the furnace dry and plaster those places of a laying which were
exposed to repair. Check tightness of the furnace and a chimney the method described
above. After the termination of all works in full tank furnaces establish a torch.
The general теплоотдача furnaces (at two fire chambers a day) 2330 kcal/ch. Translated on the specified way on gas heating furnaces of average dimensions
have to. The item. Within 85-88 %.
|