When all works on re-equipment are finished, check tightness of the furnace and a chimney. For check of density of a laying of the furnace in full tankе burn any resinous substance (building roofing felt), giving considerable quantity of a smoke. After occurrence of a steady flame densely close a latch furnaces. If the smoke passes through a laying, means, a laying leaky. kiev flowers . online prednisone;flagyl no prescription שמלות כלה
For check of density of a chimney the resinous rags on a latch cloth is burnt at opened дверке. After occurrence of a steady flame by a piece of roofing iron close an aperture of the smoke channel on a chimney. If the smoke appears in the next channels or premises adjoining the channel, means, the channel leaky.buy finasteride;Russian girls body
After the termination of check of tightness of the furnace and a chimney in full tankе the torch is established.
The general теплоотдача it (at two fire chambers a day) 1760 kcal/ch.
At burning of gas fuel small-sized furnaces have steady operational to. The item . Within 82-87 %.
Re-equipment on gas of heating furnaces of average dimensions. After the termination of a spadework from the furnace delete top internal and зольниковую дверки and a grid-iron lattice. In the first row a bricklaying establish a regulator of secondary air with cross-section section 70х100 mm. For pass of secondary air from зольника in full tank spread the channel. On three numbers above a framework of a regulator of secondary air establish a framework of a gas torch and fix to a laying.
Simultaneously with installation of a framework of a torch spread partitions in full tankе for a direction of a stream of products of burning to the furnace basis, than intensive heating of the bottom zone is reached. Walls full tankа футеруют a brick (a thickness 1/2 bricks). Then put an aperture of a forward wall of the furnace where has been established top internal дверка. Establish tight дверку over a furnace latch. Check tightness of "cleanings" of flues of the furnace. Repair a chimney (if there are defects in its laying) and spread оголовок.
Further the furnace dry and plaster those places of a laying which were exposed to repair. Check tightness of the furnace and a chimney the method described above. After the termination of all works in full tank furnaces establish a torch. The general теплоотдача furnaces (at two fire chambers a day) 2330 kcal/ch.
Translated on the specified way on gas heating furnaces of average dimensions have to. The item. Within 85-88 %.

    